Flexlink YOUTILIZE Manual de usuario Pagina 114

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 125
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 113
Providing production
efficiency
Page 114 of 125
Appendix B
Service Monitoring
The following describes what needs to be done for every conveyor in the system.
Initial measuring data
Gap, chain-beam, top
(Gap_top)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Gap_top
Thickness of chain top (Chain_top)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Chain_top
Gap, chain-side plate, idler end (Gap_idler)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Gap_idler
Thickness of tab (Chain_tab)
Formatted: Danish
Vista de pagina 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 124 125

Comentarios a estos manuales

Sin comentarios